Activity Information Verify Integration Environment
DescriptionThe integration environment should be appropriate for the development environment and address the issues and needs set forth in the product integration plan. Attributes| Element Categories | [CMMI Track 2] Planning, [CMMI Level 3] PI SP 1.2 | | When | After significant updates to the solution architecture, typically once at the beginning of each iteration. | | Entry Criteria | Integration Environment Established: The integration environment is established. | | Exit Criteria | Integration Environment Verified: The integration environment is verified to be appropriate for the project.
Configuration Audit Results: The configuration audit results are generated. | | Is Required | Yes |
StepsVerify Environment:
Verify that the integration environment is appropriate for the project. Check to see that all elements of the environment have been addressed. Compare the environment to the product integration plan to see if any issues or elements have been overlooked. Report on Configuration:
Prepare the configuration audit results to communicate the state and health of the integration environment configuration.
|
Last modified at 12/19/2007 10:37 AM by Administrator
|
|