Activity - Synchronize Database Project

Activity Information

Synchronize Database Project

Description

The database administrator needs to synchronize from the source control system the desired version of the database project locally to prepare it for deployment.

Roles

ResponsibleDatabase Administrator

Attributes

Element Categories[CMMI Level 3] PI SP 3.2, [CMMI Track 5] Deploy
Entry Criteria
Database Project in Source Control:
Database project changes have been checked in to source control system, ready for deployment.
Exit Criteria
Database Project Synchronized:
The database project is synchronized to the desired version.
Is RequiredYes

Steps

  1. Review Assigned Task:

    Review work item currently assigned to you associated with this task.

    Understand the scope and requirements of the task.
  2. Synchronize Database Project to Desired Version:

    Identify the appropriate version of the database project to be synchronized.

    Synchronize the database project to this desired version from the source control system.

Inputs and Outputs

WorkProductInputOutputAllowable States
Task(none)

Successors

TypeNameDependency Type
Verify BuildFinish-Start