Activity Information Plan Product Integration
DescriptionProduct integration planning consists of creating the integration sequence and the defining criteria to be met prior to integration. Incremental integration and testing creates a stable foundation upon which other functionality can be integrated. Attributes| Element Categories | [CMMI Track 2] Planning, [CMMI Level 3] PI SP 1.1 | | When | After significant updates to the solution architecture, typically once at the beginning of each iteration. | | Entry Criteria | Solution Architecture Complete: The solution architecture has been created and approved. | | Exit Criteria | Product Integration Planned: The sequence and criteria for product integration are planned. | | Is Required | Yes |
StepsPlan Integration Sequence:
Create the integration sequence. Sequencing depends on factors such as dependencies (functionality that must be integrated at the same time, before, or after other functionality), availability, and risk. Establish Integration Criteria:
Create the criteria to be met prior to integrating code. Typical criteria include running unit tests, conducting peer reviews, and passing code analysis tool tests. Review Integration Plan:
Review, revise, and approve the product integration planning.
|
Last modified at 12/19/2007 10:37 AM by Administrator
|
|