Activity Information Add Database Project to Source Control
DescriptionOnce the database project has been verified, it is ready to be checked into the source code control system so that it can be leveraged by the entire team. Attributes| Element Categories | [CMMI Track 2] Planning, [CMMI Level 2] CM SP 1.3 | | Entry Criteria | Database Project Verified: The database project is verified. | | Exit Criteria | Database Project Ready for Development: The database project has been created, checked in to source control, and is ready to be synced locally by developers. | | Is Required | Yes |
StepsAdd Project to Source Control System:
Ensure the desired source control system is appropriately configured.
Add the solution that contains the database project to source control. Check In Project:
Check in the project to the source control system, and associate the work item with the check-in. Resolve Work Item:
Resolve the task to establish a database project, and assign it to the project manager.
Inputs and Outputs| WorkProduct | Input | Output | Allowable States |
|---|
| Task |  | | (none) |
|