Activity Information Add Database Project to Source Control
DescriptionOnce the database project has been verified, it is ready to be checked in to the source code control system so that it can be leveraged by the entire team. StepsAdd Project to Source Control System: Ensure the desired source control system is appropriately configured. Add the solution that contains the database project to source control. Check In Project: Check in the project to the source control system, and associate the work item with the check-in. Resolve Work Item: Resolve the task to establish a database project, and assign it to the project manager.
Inputs and Outputs| WorkProduct | Input | Output | Allowable States |
|---|
| Code | /Wiki%20Pages/images/Input.gif) | /Wiki%20Pages/images/Output.gif) | (none) | | Task | /Wiki%20Pages/images/Input.gif) | /Wiki%20Pages/images/Output.gif) | New, Active, Closed |
|
Last modified at 1/17/2008 11:18 PM by Administrator
|
|